Resources on Transport (including civil aviation, railways, and road transport) sector

  1. Project Brief: Roads for Development program (R4D)

    01 March 2012

    Combining Capacity Building with the Delivery of Capital Investments in Rural Road Works

  2. Increased application of labour-based methods through appropriate engineering standards: Ghana Country Report

    01 January 2006

    This report covers the selection of test sites that are typical of labour-based roads in Ghana, monitoring and evaluating their performance and estimating their life-cycle costs

  3. Increased application of labour-based methods through appropriate engineering standards: Uganda Report

    01 January 2006

    This report covers the selection of test sites that are typical of labour-based roads in Uganda, monitoring and evaluating their performance and estimating their life-cycle costs

  4. Increased application of labour-based methods through appropriate engineering standards: Zimbabwe Country Report

    01 January 2006

    This report covers the selection of test sites that are typical of labour-based roads in Zimbabwe, monitoring and evaluating their performance and estimating their life-cycle costs

  5. Sri Lanka: Training Needs Assessment for Rural Roads Construction and Maintenance

    05 July 2004

    A report prepared jointly by: Sri Lanka Institute of Local Governance & The International Labour Organization, In collaboration with The Intermediate Technology Development Group

  6. Private Sector Participation in the Road Network Improvement Project - Mission Report

    22 August 2003

  7. Private Sector Participation in the Road Network Improvement Project - Mission Report

    15 October 2002

    Fact-finding Mission by ILO ASIST-AP, Hanoi and Ho Chi Minh City, 15 October – 1 November 2002

  8. Independent evaluation: Hanna Nassif community based settlement upgrading phase II

    02 August 2002

    Following a request from the local community the International Labour Organisation (ILO) initiated the Hanna Hassif Community Based Upgrading Project in 1993 and continued with Phase II, which started in March 1997 and (funding) finished in September 2000. The project took an innovative approach in both its institutional set up and the use of labour-based community contracting and community management in an urban environment. This Independent Evaluation was commissioned by the ILO, to evaluate the project and learn from its successes and failures.

  9. Rural transporters: a survey of transport business in rural Cambodia

    01 January 2002

    Rural Transport Infrastructure Research

  10. Rural transport studies: Three baseline surveys in Cambodia

    01 January 2002

    Rural transport infrastructure research: Seim Reap and Oddar Meanchey Provinces, Kingdom of Cambodia